🟢 Exploring the STS
01 Introduction to the STS
0/6
02 Exploring the Test Head
0/5
03 Exploring the Load Boards
0/8
04 Docking and Interfacing with the STS
0/5
05 Exploring the NI STS Software
0/10
06 Navigating the Test Developer Workflow
0/4
07 Investigating STS Safety Requirements and Speifications
0/6
🟢 Exploring NI STS Instrumentation
08 Exploring Tester Instrumentation
0/11
09 Exploring System Specifications
0/5
10 Calibrating an STS
0/11
🟢 Creating STS Projects
11 Creating an STS Project
0/8
🟢 Mapping STS Hardware to DUT Pins
12 Exploring Pin Maps
0/6
13 Reviewing a Tester Configuration and Load Board Schematic
0/5
14 Mapping Measurement Requirements
0/6
15 Mapping DUT Pins to Instrument Channels
0/7
🟢 Validating DUT Behavior
16 Interfacing with the DUT using the Device Interface Board
0/7
17 Checking DUT Continuity
0/6
18 Bringing Up the DUT
0/5
19 Measuring Leakage Current
0/5
🟢 Creating and Bursting Digital Patterns
20 Preparing to Communicate with the DUT
0/14
21 Creating Basic Digital Patterns to Communicate with the DUT
0/9
22 Converting Existing Digital Patterns
0/5
🟢 Exploring the STS Software Development
23 Exploring the Test Sequence File
0/8
24 Adding Steps to a Test Sequence
0/7
25 Creating and Configuring Test Steps
0/12
🟢 Configuring Test Programs and Steps
26 Using Test Step Templates
0/4
27 Controlling TestStand Execution for STS
0/14
28 Setting Test Limits
0/6
29 Creating Test Configurations
0/5
30 Binning DUTs Based on Test Results
0/7
31 Configuring the Execution of a Test Program
0/10
32 Generating Test Reports
0/7
🟢 Debugging the STS
33 Debugging a Test Program
0/15
34 Exploring Debugging Scenarios
0/10
35 Benchmarking Test Time
0/8
36 Interacting with Tester Resources to Debug Issues
0/9
37 Using the Digital Pattern Editor for Debugging
0/14
🟢 Using the STS Operator Interface
38 Running a Sequence with the STS Operator Interface
0/9